CA-NEWS (TM) - The State Concern "Turkmenautoyollary" (Turkmen roads) will act as a customer and contractor of phased renovation and construction of new roads of the 1st technical category with a total length of 1676 km. As the Turkmenistan.ru correspondent reports from Ashgabat, by October 2014 the construction and reconstruction of roads in areas Archman - Turkmenbashi, Anau - Mary, Mary - Turkmenabat, Turkmenabat - Farabi and Turkmenistan - Karakum - Dashoguz will be completed.
The width of the carriageway in each direction will be 12.25 meters. All roads going through villages will be equipped with lights and improved. Sand dunes will be strengthened and interchanges will be built in the area of road construction.
|